lhb tender
visakhapatnam, andhra pradesh
- battery fuse box +ve for lhb coaches as per rcfs drawing no. lw 71001, alt - i or latest.
- Authority : East Coast Railway
- Deadline : 27 Oct 2026
- Value : Refer Document
- Download
izzatnagar, uttar pradesh
- 60 kva transformer for eog lhb coaches
- Authority : South Eastern Railway
- Deadline : 27 Oct 2026
- Value : Refer Document
- Download
chennai, tamil nadu
- yaw damper for fiat bogie of lhb coaches
- Authority : Southern Railway
- Deadline : 26 Oct 2026
- Value : Refer Document
- Download
kolkata, west bengal
- procurement of supply, installation and commisioning of iot based water level indicator system for lhb (ac & non ac) coaches with underslung water tank.
- Authority : Eastern Railway
- Deadline : 26 Oct 2026
- Value : Refer Document
- Download
samastipur, bihar
- supply of lhb braking system simulator
- Authority : East Central Railway
- Deadline : 23 Oct 2026
- Value : Refer Document
- Download
jaipur, rajasthan
- power contactor [with diode] for compressor unit of lhb type ac coaches, 3 pole, rated current- 32 a (at rated voltage & ac-3 utilization category), rated voltage- 690 v, coil voltage 77-143 vdc, with surge supressor, with 1 nc aux contact, conforming to
- Authority : North Western Railway
- Deadline : 22 Oct 2026
- Value : Refer Document
- Download
chennai, tamil nadu
- brake cylinder left version for lhb coach
- Authority : Southern Railway
- Deadline : 19 Oct 2026
- Value : Refer Document
- Download
kapurthala, punjab
- set of window inner frame for lhb gs, scn & slrd amrit bharat 3.0 coaches. (three types)
- Authority : Rail Coach Factory
- Deadline : 19 Oct 2026
- Value : Refer Document
- Download
mumbai, maharashtra
- set of switch plate assemblies for lhb eog second class ac chair car coaches
- Authority : Central Railway
- Deadline : 19 Oct 2026
- Value : Refer Document
- Download
ahmedabad, gujarat
- ahmedabad division - outsourcing of ac coach electrical attendant for escorting, operation troubleshooting of lhb ac, sg ac vande bharat coaches of primary maintenance trains of kutch area (gimb bhuj) for two years
- Authority : Western Railway
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
delhi
- supply of composite pantry for lhb eog coach
- Authority : Rail Coach Factory
- Deadline : 16 Oct 2026
- Value : Refer Document
- Download
samastipur, bihar
- supply of protection cover for lhb axle
- Authority : East Central Railway
- Deadline : 15 Oct 2026
- Value : Refer Document
- Download
delhi
- refrigerant r-407 c, suitable for rmpu in lhb type ac coaches eco friendly hfc (r-407 c).
- Authority : Northern Railway
- Deadline : 14 Oct 2026
- Value : Refer Document
- Download
bhavnagar, gujarat
- provision of double inlet blower in lavatories of lhb/eog coaches as per scope of work at bhavnagar workshop for 1 year.
- Authority : Western Railway
- Deadline : 14 Oct 2026
- Value : Refer Document
- Download
bikaner, rajasthan
- corrective repair annual maintenance contract of electrical appliances in pantry of lhb and vb coaches of primary maintenance train over ju division for a period of 02 years.
- Authority : North Western Railway
- Deadline : 13 Oct 2026
- Value : Refer Document
- Download
guntakal, andhra pradesh
- set of fixture for lhb control arm
- Authority : South Central Railway
- Deadline : 13 Oct 2026
- Value : Refer Document
- Download
gorakhpur, uttar pradesh
- wedge key sub assembly as per escort part no. sk-1608 for cbc in lhb coaches to rdso specn no. rdso/2011/cg-03(rev.1).
- Authority : South Eastern Railway
- Deadline : 13 Oct 2026
- Value : Refer Document
- Download
gorakhpur, uttar pradesh
- front carrier plate for cbc in lhb coaches to escorts part no. sk-476 confirming to rdso specn no. rdso/2011/cg-03(rev.01).
- Authority : South Eastern Railway
- Deadline : 13 Oct 2026
- Value : Refer Document
- Download
jagadhri, haryana
- work of various activities of aspiration type fire detection system installed in lhb ac coaches for 12 months
- Authority : Northern Railway
- Deadline : 12 Oct 2026
- Value : Refer Document
- Download
jagadhri, haryana
- work of various activities of aspiration type fire detection system installed in lhb ac coaches for 12 months
- Authority : Northern Railway
- Deadline : 12 Oct 2026
- Value : Refer Document
- Download
railway tender from :
