jagadhri railway tender
jagadhri, haryana
- work of design, supply, installation, commissioning testing of industry 4.0 wireless error-proof torquing system for complete data accusation by customized software for lhb coaches including 3 year post-warranty amc at jagadhri workshop northern rai
- Authority : Northern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- work of stripping of lhb fiat bogies during poh ioh maintenance schedule with bolster stripping and fitment of lhb coaches in poh maintenance schedule and assembling of ss-1 lhb fiat bogies at jagadhri workshop northern railway for 36 months.
- Authority : Northern Railway
- Deadline : 29 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- suspension arrangement of 150 ltrs. reservoir as per drg.no.et 36167, alt-a or latest. stainless steel fitted with (a) m20 hex nut & m20 thin nut : stainless steel prevailing torque type hexagon to is :7002-2018(iso 7040:2012) (reaffirmed year ;2023), a2-
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of male elbow with conical seating
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- work of stripping, cleaning, repairing and refitting of 3600 underslung water tanks of lhb coaches; stripping of lavatory ceiling/roof and arch for 7500 overhead tanks of non ac icf/lhb coaches; on spot testing of 3000 overhead tanks of non ac icf coaches
- Authority : Northern Railway
- Deadline : 01 Jun 2026
- Value : Refer Document
- Download
jagadhri, haryana
- over hauling kit for kes type (faiveley-ftrtipl part no. no. 040 0300 00) dump valve ftrtipl part no.1/604620 a for wsp system for lhb coaches consisting of items as per attached annex ure. [ warranty period: 36 months after the date of delivery ]
- Authority : Northern Railway
- Deadline : 25 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of capacitor 1 kvar
- Authority : Northern Railway
- Deadline : 25 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- indicator for air brake system of lhb coaches. part no.: - m/s knorr-bremse part no. i 48102/w or description: - single brake indicator assly. for air brake system of lhb coaches part no.:- m/s faiveley part no.045002000 or description:- single brake indi
- Authority : Northern Railway
- Deadline : 25 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of high tensile hardwares for fiat bogies
- Authority : Northern Railway
- Deadline : 25 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- set of stop for wag9/wap7 locos as per clw specification no.clw/ms/3/010.alt-nil consist of 02 items (1)lateral stop as per clw drg.no.1209.01.315.021. alt-1 .(abb drg.no.ib 016-00006 .(2)vertical stop as per clw dgr.no.1209.01.315.022. alt-nil (abb drg.n
- Authority : Northern Railway
- Deadline : 25 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply & application of heavy duty epoxy flooring 4 mm in ac shop judw along with yellow marker line as per scope of work annexure-a
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of exhaust air valve for lhb coaches
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- synthetic enamel, interior, finishing, smoke grey for the system of interior painting of coaches. specification:- is 133:2023(sixth revision) including optional requirements mentioned in table 2 & 3 of is 133:2023(sixth revision), isc:692 with rdso amendm
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- wheel set earthing equipment (complete) for lhb coaches. specification no. :- rcf spec. edts 101 (rev. c) (amnd.-3) (corr. 1 to 10) annexure 1 [ warranty period: 30 months after the date of delivery ]
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of set of wear plate
- Authority : Northern Railway
- Deadline : 21 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of apd for angle cock
- Authority : Northern Railway
- Deadline : 18 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of extruded flat moulding (2000 mm length.) drawing no.:- cc-43335, alt.(nil) [ warranty period: 30 months after the date of delivery ]
- Authority : Northern Railway
- Deadline : 14 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of extruded unequal angle moulding with 2000 mm length. drawing no.:- cc-43355, alt. (a) [ warranty period: 30 months after the date of delivery ]
- Authority : Northern Railway
- Deadline : 14 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of enamel synthetic, exterior, undercoating, white. specification:- is 8662:2024 (third revision) along with rdso amendment no. 1 a(rev.1.0) as an additional requirement. [ warranty period: 12 months after the date of delivery ]
- Authority : Northern Railway
- Deadline : 14 May 2026
- Value : Refer Document
- Download
jagadhri, haryana
- supply of rubber based adhesive.specification no. icf/m/d/spec-028 (rev-4) amendment 1 nb: material shall be packed in 5 liters suitable container. [ warranty period: 6 months after the date of delivery ]
- Authority : Northern Railway
- Deadline : 14 May 2026
- Value : Refer Document
- Download
